MRT project (package V4) in Kuala Lumpur Malaysia

MRT project (package V4) in Kuala Lumpur Malaysia

  • Involved with design checking of substructure pier, crossheads, the foundation of the pier, pile caps and pile group analysis.
  • Involved with temporary work design checking of superstructure and substructures.
  • Designed with reference to BS5400, BS5950 and BD37/01.
  • Software used includes STAAD Pro, SAM Leap, REPUTE, SCALE, Prokon, and in-house spreadsheet software.