MRT project (package V4) in Kuala Lumpur Malaysia
MRT project (package V4) in Kuala Lumpur Malaysia
- Involved with design checking of substructure pier, crossheads, the foundation of the pier, pile caps and pile group analysis.
- Involved with temporary work design checking of superstructure and substructures.
- Designed with reference to BS5400, BS5950 and BD37/01.
- Software used includes STAAD Pro, SAM Leap, REPUTE, SCALE, Prokon, and in-house spreadsheet software.